01
Engineering brief
We define the site, herd, production targets and constraints.
Integrated farm projects · Uzbekistan
We connect Evoteck infrastructure, DairyMaster milking, calf rearing, animal comfort, KERBL everyday equipment, laboratory control, commissioning and service into one project.
LabLog × Evoteck × DairyMaster × KERBL

01
We define the site, herd, production targets and constraints.
02
We develop zoning and verify interfaces between all systems.
03
We define equipment, infrastructure, installation and responsibilities.
04
We coordinate supply, installation, commissioning, training and service in Uzbekistan.
The project covers more than the building. Layout, climate, animal housing, milking, calf rearing, feeding, quality control and everyday equipment are coordinated by capacity, location and engineering requirements.
Buildings and infrastructure
Open solutionMilking and herd management
Open solutionEquipment for everyday farm work
Open solutionLabLog · integrated project
Complete what is already known. This is not an instant price: an engineer will connect the building, technology and equipment into one project.
Cookies and analytics
GA4 receives a cookieless, non-personalized visit signal. Analytics storage and Yandex Metrica are enabled only after your consent.