Heat balance
- milk volume and cooling temperatures
- refrigeration-system capacity
- daily hot-water requirement
- incoming water temperature
DairyMaster · Heat recovery
A system that recovers part of the refrigeration heat for farm hot-water preparation.

Quick decision
Consider it when
Farms with milk-cooling demand and significant hot-water use
We clarify before quoting
Herd size, operating zone and housing method, daily load, dimensions and routes, water, power, cleaning and service.
Another solution may be better when
Animal group, layout, capacity, operating method or site utilities differ.
Farms with milk-cooling demand and significant hot-water use
Cooling engineering scope
Heat recovery connects refrigeration with water preparation for sanitation. Economics depend on matching available heat, hot-water storage and the consumption schedule.

We verify summer ambient temperature, water temperature and quality, available electrical capacity, backup power, milking schedule and milk collection. Configuration is fixed only after thermal and hydraulic calculations.
A manufacturer heat-recovery statement does not guarantee complete hot-water coverage. LabLog calculates useful heat, losses, storage and mandatory backup heating.
LabLog
The final parlour configuration depends on milking herd size, milking frequency, group size, shift duration, building layout, collecting yard, operators, water, power and milk cooling. LabLog starts with an engineering brief and never defines throughput from stall count alone.
Cookies and analytics
GA4 receives a cookieless, non-personalized visit signal. Analytics storage and Yandex Metrica are enabled only after your consent.
Privacy policy