DairyMaster engineering project

A milking parlour designed for your farm

We do not select a standard configuration blindly. Herd, groups, milking duration, building, cow flow, automation and cooling are engineered as one system.

DairyMaster × LabLog

What we verify before a proposal

  • Milking herd, frequency and farm growth
  • Groups, collecting yard, entry, exit and drafting
  • Operator pit, existing building or new construction
  • Milk line, vacuum, water, washing and drainage
  • Cooling, heat recovery and milk room
  • Milk Manager, meters, monitoring and feeding
DairyMaster

From project inputs to first milking

01

Engineering brief

We collect plans, herd data, operating targets and constraints.

02

Concept

We compare parlour types and calculate the complete process.

03

Configuration

We define equipment, automation, building and utility requirements.

04

Installation and start-up

Installation, checks, first milking, training and service planning.

Turnkey farm · LabLog

From design and building to commissioning and daily operation

LabLog connects Evoteck infrastructure, DairyMaster milking, calf rearing, animal comfort, KERBL equipment, laboratory control and service into one engineering project.

LabLog × DairyMaster

Project inputs

Complete whatever is already known. A finished building design is not required for the first discussion.

The request goes to the LabLog engineering team. Pricing follows confirmation of equipment, building, installation and logistics.

By submitting this form, you agree to the processing of your contact data under our privacy policy.

LabLog Telegram channel

Want to compare the options first?

Our guide explains Cow Rotary, Swiftflo Double, Fast Exit and Herringbone without generic throughput promises.

Open the guide

Cookies and analytics

GA4 receives a cookieless, non-personalized visit signal. Analytics storage and Yandex Metrica are enabled only after your consent.

Privacy policy